Title: Authorizing the City Manager to enter into a contract with Birdair, Inc. in the amount of $424,600.00 for the replacement of a PVC Mesh Roof and new support cables for the Inner City Swimming Pool. Funding is available in the 2023 Certificate of Obligation Bond.
Attachments: 1. 240119-SAM23-03031-120 Birdair Replacement Proposal-BI Executed
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT

title

Authorizing the City Manager to enter into a contract with Birdair, Inc. in the amount of $424,600.00 for the replacement of a PVC Mesh Roof and new support cables for the Inner City Swimming Pool. Funding is available in the 2023 Certificate of Obligation Bond.

 

body

PREVIOUS COUNCIL ACTION

None

 

BACKGROUND

Birdair designed and installed the original tensile fabric in 2003. 

The canopy fabric has ruptured in several places and requires replacement. An inspection was conducted by Synergy Structural Engineering, Inc., to provide a limited structural observation of the pool canopy and concrete columns. Their recommendation was that the canopy be replaced.  Item was placed for consideration and approved through the CIP Budget Workshop on August 10, 2023.  The Budget was approved on September 18, 2023. Replacement through the 2023 CO. 

 

COMMITTEE RECOMMENDATION

None

 

STAFF RECOMMENDATION

recommendation

Staff recommends approval

end

Fiscal Impact

 

Fiscal Year:                                                                                                          2024

Budgeted Y/N?:                                                                                    Yes

Source of Funds:                                                                                     2023 Certificate of Obligation

Account #:                                                                                                          476-3118-535-9301

Change Order: Exceeds 25% Y/N:                      N/A

 

FINANCIAL IMPACT:

Funding through the 2023 Certificate of Obligation Bond with project #PA2402.