Legislation Details

File #: 26-P&Z-702    Version: 1
Type: Preliminary Plats and Replats Status: Agenda Ready
File created: 8/27/2026 In control: Planning & Zoning Commission
On agenda: 9/3/2026 Final action:
Title: Preliminary consideration of the plat of Lot 1, Block 1, Villssek Subdivision. The intent is industrial. PL-179-2026 District VII – Cm. Vanessa Perez
Sponsors: Planning & Zoning Commission
Attachments: 1. Aerial Location Map, 2. Plat Notes, 3. Plat Exhibit
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
/
SUBJECT
title
Preliminary consideration of the plat of Lot 1, Block 1, Villssek Subdivision. The intent is industrial.

PL-179-2026
District VII – Cm. Vanessa Perez
body

BACKGROUND
APPLICANT: Villssek CO. INC
ENGINEER: Sabio Engineering

PROPERTY INFORMATION:
Location: West of Old Santa Maria Road and South of Island Street
Size: Approximately 3.46921 acres, more or less
Proposed Development: 1 Lot
Current Zoning: M-1 (Light Manufacturing District)
Council District: District VII – Cm. Vanessa Perez

STAFF RECOMMENDATION
recommendation
APPROVES SUBJECT TO THE FOLLOWING COMMENTS:
Planning:
1. Identify and show the existing communication tower easement and access easement on the plat drawing.

2. Revise the plat to a replat of Tract 37 out of North Laredo Land Irrigation & Water Co. Plat (See Vol 1, Pg. 104, Webb County Plat Records). Keep the original subdivision name and tract (e.g., “…into Tract 37A”), and include the “As Platted” section.

3. Revise the legal description to reflect the correct property description.

4. Revise Plat Note No. 4 to state the following: “All curb cuts shall comply with the Standard Technical Specification Manual, as may be amended from time to time.”

5. Identify all easements.

6. All improvements as per the Subdivision Ordinance.

Parks: No comments submitted.
Fire: No comments submitted.
Traffic Safety: No comments submitted.
Engineering: No comments submitted.
Environmental: No comments submitted.
Water & Utilities: No comments submitted.
WEBB County App: No comments submitted.
AEP Engineers: No comments submitted.
U.I.S.D.: No comments submitted.
L.I.S.D.: No comments submitted.
AT&T: No comments submitted.

NOTICE TO THE DEVELOPER:
Planning:
1. Only the utility easements within the plat boundaries are subject to change prior to plat recordation due to revisions by the utility companies.
2. All comments set forth are preliminary comments and not an exhaustive list. Additional comments may be added prior to fin...

Click here for full text