Skip to main content

File #: 26-P&Z-402    Version: 1
Type: Preliminary Plats and Replats Status: Agenda Ready
File created: 1/28/2026 In control: Planning & Zoning Commission
On agenda: 2/5/2026 Final action:
Title: Preliminary consideration of the replat of Lot 3, Block 7, SINE Las Palmas Subdivision, Phase 2 into Angulo SINE Residential Subdivision, Phase 2. The intent is residential. PL-059-2026 District VI - Cm. Dr. David Tyler King
Sponsors: Planning & Zoning Commission
Attachments: 1. Aerial Location Map, 2. Plat Notes, 3. Plat Exhibit
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT
title
Preliminary consideration of the replat of Lot 3, Block 7, SINE Las Palmas Subdivision, Phase 2 into Angulo SINE Residential Subdivision, Phase 2. The intent is residential.

PL-059-2026
District VI - Cm. Dr. David Tyler King

body
PREVIOUS COUNCIL ACTION
N/A

BACKGROUND
APPLICANT: JHN Ranches, LLC
ENGINEER: Peua Consulting, LLC

SITE: This 4.78-acre tract of land is located south of Juan Escutia Blvd. and west of Cavatina Dr. The zoning for this 37-lot development is R-2 (Multi-Family District). This tract is located in District VI - Cm. Dr. David Tyler King.

COMMITTEE RECOMMENDATION
N/A

STAFF RECOMMENDATION
recommendation
APPROVE SUBJECT TO THE FOLLOWING COMMENTS:
Planning:
1. Provide a plat note stating that the lots adjacent to Cavatina Drive will not have access to said Cavatina Drive, as double frontage lots should be avoided (Section 3.3 D. - Subdivision Ordinance).

2. Provide a plat note stating the purpose of the replat.

3. Provide the correct volume and page references for the adjacent platted tracts (San Isidro Northeast Las Palmas Subdivision Phase 2).

4. A zone change will be required for the intended use. Please note that preliminary plat approval does not constitute a staff position on zone change requests. Staff's official position will be provided only upon formal submittal of a zone change application. All zone change requests are subject to City Council discretion and are not guaranteed. Should the request be denied, a plat revision will be required.

5. The developer has submitted a notice of intention to place utilities in the front of the lot. The front-of-lot utility layout/schematics, as prepared by the Developer's engineer, shall be submitted to plan review (Section 3-4 B.2 - Subdivision Ordinance).

6. Identify all easements.

7. All improvements as per the Subdivision Ordinance.

Fire:
1. Fire hydrants required every 500ft for residential development. (Ordinance 2012-O-183, IFC 2012 Section 507.5.1, where...

Click here for full text