Title: Consideration for approval of Amendment #1, an increase of $523,400.72 to the professional services contract with to RS&H, Inc., San Antonio, Texas, for an amount not to exceed $851,104.72 for 30% design services for Runway 18R runway extension and EMAS demolition project. Services for this project are eligible for reimbursement by the Federal Aviation Administration (FAA). Funding is available in the Airport Construction Fund.
Attachments: 1. LRD Runway 18R Extension FEE Proposal v 1
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT
title
Consideration for approval of Amendment #1, an increase of $523,400.72 to the professional services contract with to RS&H, Inc., San Antonio, Texas, for an amount not to exceed $851,104.72 for 30% design services for Runway 18R runway extension and EMAS demolition project. Services for this project are eligible for reimbursement by the Federal Aviation Administration (FAA). Funding is available in the Airport Construction Fund.

body

PREVIOUS COUNCIL ACTION
A professional service contract was awarded to RS&H, Inc. for the Laredo International Airport Environmental Assessment for the removal of the Engineered Material Arresting System (EMAS) for Runway 36L (Proposed action) approved by City Council on July 21, 2025.

BACKGROUND
The proposed project will include the Environmental Assessment for the removal of the Engineered Material Arresting System (EMAS) for Runway 36L. The EMAS was installed in 2006 with a 10-year life cycle. A top tray lid retrofit was completed in 2012 to extend the service life of the bed. Based on the report prepared by Runway Safe in 2024, a bed replacement is needed. The integrity of the seam seal over the entirety of the bed is deteriorating and the vents in the bed are very brittle to point of breaking when cleaned. In the 2024 FAA Inspection, it was documented by FAA Inspector that it was in poor condition and it had to be corrected. The FAA has proposed removing the EMAS and extending one of the runways.

Additional project components include providing a standard runway safety area (RSA) for Runway 36L, extending an existing runway to provide sufficient runway length to accommodate the critical aircraft operating at LRD, extending existing taxiways (as needed), and potentially relocating existing navigational aids (NAVAIDS).

VIVA LAREDO PLAN ALIGNMENT
Alignment Rating:
Supporting goal(s)/policy(ies):
Summary of alignment:

COMMITTEE RECOMMENDATION
Item will be presented to the Airport Advisory Board.