File #: 25-P&Z-366    Version: 1
Type: Master Plan Consideration Status: Agenda Ready
File created: 12/30/2025 In control: Planning & Zoning Commission
On agenda: 1/8/2026 Final action:
Title: Review and consideration of the Los Cielos at Cielito Lindo masterplan. The intent is residential. PL-038-2026 District I - Cm. Gilbert Gonzalez
Sponsors: Planning & Zoning Commission
Attachments: 1. Aerial Location Map, 2. Plat Exhibit
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT
title
Review and consideration of the Los Cielos at Cielito Lindo masterplan. The intent is residential.

PL-038-2026
District I - Cm. Gilbert Gonzalez

body
PREVIOUS COUNCIL ACTION
N/A

BACKGROUND
APPLICANT: TDB Land Holdings, LTD
ENGINEER: Top Site Civil Group, LLC

SITE: This 80.48-acre tract of land is located south of Cielito Lindo Blvd. and west of Cuatro Vientos Blvd. The zoning for this 576-lot development is R-1A (Single Family Reduced Area District) and R-1B (Single-Family High-Density District). This tract is located in District I - Cm. Gilbert Gonzalez.

COMMITTEE RECOMMENDATION
N/A

STAFF RECOMMENDATION
recommendation
APPROVE SUBJECT TO THE FOLLOWING COMMENTS:
Planning:

1. The proposed master plan does not comply with the Future Thoroughfare Plan in that St. Luke Boulevard is to extend as a collector in a southerly direction followed by a westerly connection towards Ejido Avenue. Revise accordingly.

2. Phase I includes streets that exceed the maximum allowed continuous street length of 1,000 feet for local residential streets. Revise the street layout to comply with Section 3-2 N. 2. a. of the Subdivision Ordinance.

3. Phase I includes blocks that exceed the maximum allowable block length of 1,200 feet. Revise the layout accordingly to comply with Section 3-2 N. 1. of the Subdivision Ordinance.

4. The westernmost entrance of Phase I (Street F) creates a street jog with the westernmost entrance of Phase II (Street A). Revise the layout accordingly.

5. Provide stub out street connections in Phases 4 and 5 to the south and west for future extension and connectivity to adjacent properties, in accordance with Section 3-2 (L) of the Subdivision Ordinance.

6. Identify all adjacent property owners (e.g., New Lake Investments, LTD to the south).

7. The master plan identifies TDB World Industrial Park, LLC as the owner. Update the face of the master plan to reflect the owner/developer as TDB Land Holdings, Ltd as per the application and ...

Click here for full text