Title: Consideration to award a construction contract to the lowest responsible, responsive bidder Soliz Paving, Inc, Laredo, Texas in the amount not to exceed $3,911,966.60 for FY26-ENG-52 Springfield Avenues Extension, Phase 1 Project for the total base bid. Construction contract time is 220 working days. Funding is available in the 2024A Certificate of Obligation Bond. 1. Soliz Paving Inc, Laredo, Texas Total Base Bid: $3,911,966.60 2. SAL Construction Management LLC, Laredo, Texas Total Base Bid: $4,729,752.10 3. Mage 4 Group, Ltd., Laredo, Texas Total Base Bid: $5,471,907.00 4. 360 General Contractor Inc., Laredo, Texas Total Base Bid: $7,764,638.95 Refer to attached letter of recommendation from Porras Nance Engineering Company, Laredo, Texas.
Attachments: 1. Award Recommend SF 1 - 09-23-26
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
/
SUBJECT
title
Consideration to award a construction contract to the lowest responsible, responsive bidder Soliz Paving, Inc, Laredo, Texas in the amount not to exceed $3,911,966.60 for FY26-ENG-52 Springfield Avenues Extension, Phase 1 Project for the total base bid. Construction contract time is 220 working days. Funding is available in the 2024A Certificate of Obligation Bond.

1. Soliz Paving Inc, Laredo, Texas
Total Base Bid: $3,911,966.60
2. SAL Construction Management LLC, Laredo, Texas
Total Base Bid: $4,729,752.10
3. Mage 4 Group, Ltd., Laredo, Texas
Total Base Bid: $5,471,907.00
4. 360 General Contractor Inc., Laredo, Texas
Total Base Bid: $7,764,638.95

Refer to attached letter of recommendation from Porras Nance Engineering Company, Laredo, Texas.
body

PREVIOUS COUNCIL ACTION
On April 20, 2020, City Council awarded a professional services contract to Porras Nance Engineering Company, Laredo, Texas, for an amount not to exceed $397,500.00 for the design and preparation of plans and specifications for the Springfield Avenue Extension form the southern end near Del Mar Blvd. to San Isidro Parkway/Bob Bullock Loop on the northern (Phase 1 & 4).

BACKGROUND
The Project consists of Constructing approximately 13,600 SY of roadway pavement, 57,700 SF of sidewalks, 1500 LF of RCP Storm Drains, 2500 LF of PVC Water Main, 950 LF of PVC Sewer Main, with related ramps, striping, landscape, appurtenances, and incidentals. Construction contract time for the project is Two hundred and twenty (220) Working Days.

A total of four (4) bids, three electronic and one manual submittal, were received at the City Secretary’s office on Thursday, September 10, 2026 at 4:00 P.M. which were publicly opened, read and taken advertisement on Friday, September 11, 2026 at 2:00 P.M.


Total Base Bid
360 General Contractor Inc. $7,764,638.95
Mage 4 Group, Ltd. $5,471,907.00
SAL Construction Management LLC $4,729,752.10
Soliz Paving Inc $3,911,966.60

Refer ...