File #: 26-P&Z-501    Version: 1
Type: Preliminary Plats and Replats Status: Agenda Ready
File created: 4/10/2026 In control: Planning & Zoning Commission
On agenda: 4/16/2026 Final action:
Title: Preliminary consideration of the plat of Phoenix Village Subdivision Phase XIV (14). The intent is residential. PL-084-2026 District III - Cm. Melissa R. Cigarroa
Sponsors: Planning & Zoning Commission
Attachments: 1. Front-Lot-Utility Letter, 2. Aerial Location Map, 3. Plat Notes, 4. Plat Exhibit
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT
title
Preliminary consideration of the plat of Phoenix Village Subdivision Phase XIV (14). The intent is residential.

PL-084-2026
District III - Cm. Melissa R. Cigarroa

body
PREVIOUS COUNCIL ACTION
N/A

BACKGROUND
APPLICANT: AFW Investments
ENGINEER: Premier Engineering

SITE: This 9.62-acre tract of land is located north of Estrella Drive and east of Serrano Road. The zoning for this 50-lot development is R-1MH (Single Family Manufactured Housing District). This tract is located in District III - Cm. Melissa R. Cigarroa.

COMMITTEE RECOMMENDATION
N/A

STAFF RECOMMENDATION
recommendation
APPROVE SUBJECT TO THE FOLLOWING COMMENTS:
Planning:
1. Revise the phase number to Phase 16, as Phase 14 already exists within the masterplan.

2. Provide lot dimensions and ensure compliance with the minimum dimensional requirements of the applicable zoning district.

3. Provide a plat note stating the following: "No more than one single-family detached dwelling shall be located on an individual lot." (Section 24.80.4 (I) - Land Development Code, Module Rules).

4. Provide a plat note stating the following: "The setback shall be determined based on the current zoning in accordance with Section 24.77.1 of the Laredo Land Development Code."

5. Provide Lot Summary Table.

6. Provide Base Flood Elevations (BFEs) as per Section 24.69.7 C (3) - Land Development Code.

7. The developer has submitted a notice of intention to place utilities in the front of the lot. The front-of-lot utility layout/schematics, as prepared by the Developer's engineer, shall be submitted to plan review (Section 3-4 B.2 - Subdivision Ordinance).

8. Remove "Interim" from the Planning Director's certificate block.

9. Identify all easements.

10. All improvements as per the Subdivision Ordinance.

Fire:
1. Fire hydrants required every 500ft for residential development.

2. Dead-end roads in excess of 150 feet require a turn-around or temporary turnaround (96-foot cul-de-sac, 120-f...