Legislation Details

File #: 26-P&Z-514    Version: 1
Type: Master Plan Consideration Status: Agenda Ready
File created: 4/28/2026 In control: Planning & Zoning Commission
On agenda: 5/7/2026 Final action:
Title: Consideration of a revision to the Village South Subdivision Masterplan. The intent is residential and commercial. The purpose of this revision is to renumber phases and reconfigure lot layout. PL-098-2026 District I - Cm. Gilbert Gonzalez
Sponsors: Planning & Zoning Commission
Attachments: 1. Aerial Location Map, 2. Village South Subd. MP (CURRENT APPROVED 02-19-2025), 3. Village South Subd. MP - REVISION SUBMITTED
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT
title
Consideration of a revision to the Village South Subdivision Masterplan. The intent is residential and commercial. The purpose of this revision is to renumber phases and reconfigure lot layout.

PL-098-2026
District I - Cm. Gilbert Gonzalez

body

BACKGROUND
APPLICANT: Village 83 South, Ltd.
ENGINEER: Porras Nance Engineering

PROPERTY INFORMATION:
Location: Northwest of Cuatro Vientos Road and Cielito Lindo Boulevard
Size: Approximately 136.48 acres, more or less
Proposed Development: 818 lots
Current Zoning: R-1MH (Single Family Manufactured Housing), R-1A (Single Family Reduced Area), R-1B (Single Family High Density), B-1 (Limited Business), and B-3 (Community Business)
Council District: District I - Cm. Gilbert Gonzalez


STAFF RECOMMENDATION
recommendation
APPROVE SUBJECT TO THE FOLLOWING COMMENTS:
Planning:
1. Submit a masterplan revision to the City of Laredo Building Services GIS Division within 10 days of commission approval in a geo-referenced CAD file in accordance with Section 2-3.2 (a) 4 - Subdivision Ordinance.

2. All improvements as per the Subdivision Ordinance.

Traffic Safety:
1. Show access easement to phase 13. Access easements intended for primary access to a proposed lot or building shall be 50' wide with a 30' paving section. (As per Subdivision Ordinance Handbook, Section 3-2).
C. Each lot shall be provided with adequate access to an existing public street by frontage along such street or through connection of a new street or a permanent easement to an existing street (As per Subdivision Ordinance Handbook, Section 3-3, C).

2. Check sight distance (as per Subdivision Ordinance Handbook Section 3-2).

3. Block lengths shall not exceed one thousand two hundred feet (1,200) or be less than three hundred (300) feet, except as may be required by the Commission in the proper projection of existing major thoroughfares, and on existing platted blocks. (As per Subdivision Ordinance Handbook Section 3-2).
a. Block lengt...

Click here for full text