SUBJECT
title
Consideration to award a construction contract to the lowest, responsible, responsive bidder ALC Construction CO., Inc., Laredo, Texas in the amount not to exceed $637,800.00 for FY24-ENG-87 Forest Loop Drainage Channel Project for the total base bid including a $70,000.00 contingency allowance. Construction contract time is 120 working days. Funding is available in the Environmental Services Fund-2016 and 2019 Certificate of Obligations.
1. ALC Construction Co., Inc., Laredo, Texas
Total Base Bid: $637,800.00
2. SAL Construction Management, Laredo, Texas
Total Base Bid: $839,539.80
3. ABBA Construction, LLC, Laredo, Texas
Total Base Bid: $864,127.50
Refer to attached letter of recommendation.
body
VIVA LAREDO PLAN ALIGNMENT
Alignment Rating: Strong
Supporting goal(s)/policy(ies):
Policy 6.7.6 Prioritize stormwater management and drainage improvements that mitigate flood risk and improve public safety.
Policy 6.7.8 Incorporate green and gray infrastructure solutions to manage stormwater runoff and protect neighborhoods from flooding.
Summary of alignment: The Forest Loop Drainage Channel Project aligns strongly with the Viva Laredo Comprehensive Plan by implementing targeted infrastructure improvements that directly reduce flood risk and enhance public safety. It fulfills specific policy directives related to stormwater management, public infrastructure, and capital investment coordination.
By improving drainage capacity in the Forest Loop area, the project supports themes of resilience, sustainability, and climate preparedness while protecting residential neighborhoods. The project leverages gray infrastructure to address current and future environmental challenges consistent with the City’s long-range vision.
PREVIOUS COUNCIL ACTION
On May 19, 2025, City Council approved rejection of all bids received for FY24-ENG-87 Forest Loop Channel Project, and authorization to rebid the project as one of the bids received was significantly higher than anticipated and one of the bids received was incomplete. There is no financial impact at this time.
BACKGROUND
This project consists of constructing 10,300 SF of reinforced concrete riprap (channel), 11,500 SF of reinforced concrete riprap (aprons), concrete energy dissipator blocks, 50 LF of retaining walls, and subsidiary work. Construction contract time for the project is one hundred and twenty (120) working days.
A total of four (3) electronic bids were received at the City Secretary’s office on Thursday, June 19, 2025 at 4:00 P.M. which were publicly opened, read and
taken advertisement on Friday, June 20, 2025 at 10:00 A.M.
Contractor |
Total Base Bid including Contingency Allowance |
ALC Construction Co., Inc. |
$637,800.00 |
SAL Construction Management |
$839,539.80 |
ABBA Construction, LLC |
$864,127.50 |
Based on our evaluation of the bids received, the City of Laredo Engineering Department recommends that this project be awarded to ALC Construction Co., Inc., with that bid being determined the lowest responsible, responsive bidder of the three submitted for our consideration in the amount not to exceed $637,800.00 which includes the base bid and a $70,000.00 contingency allowance. Bid tabulation is attached for your review.
COMMITTEE RECOMMENDATION
N/A
STAFF RECOMMENDATION
recommendation
Approval of this motion.
end

Fiscal Impact
Fiscal Year: 2025
Budgeted Y/N?: Y
Source of Funds: Environmental 2016 & 2019 C.O.
Account #: Various
Change Order: Exceeds 25% Y/N: N/A
FINANCIAL IMPACT:
Funding is available in the Environmental Services Fund- 2016 & 2019 C.O.
Accounts:
249-9871-545-9301 $390,884.00
249-9874-545-9301 $246,916.00
$637,800.00