Skip to main content

File #: 26-P&Z-380    Version: 1
Type: Master Plan Consideration Status: Agenda Ready
File created: 1/15/2026 In control: Planning & Zoning Commission
On agenda: 1/22/2026 Final action:
Title: Review and consideration of the Los Cielos at Cielito Lindo masterplan and the granting of a variance to the maximum allowed continuous street length of 1000 feet pursuant to Section 3-2 N 2. a. of the Subdivision Ordinance and the maximum block length of 1,200 feet pursuant to Section 3-2 N 1 of the Subdivision Ordinance. The intent is residential. PL-038-2026 District I - Cm. Gilbert Gonzalez
Sponsors: Planning & Zoning Commission
Attachments: 1. Aerial Location Map, 2. Masterplan Exhibit, 3. Variance Letter, 4. Traffic Masterplan Exhibit
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT

title

Review and consideration of the Los Cielos at Cielito Lindo masterplan and the granting of a variance to the maximum allowed continuous street length of 1000 feet pursuant to Section 3-2 N 2. a. of the Subdivision Ordinance and the maximum block length of 1,200 feet pursuant to Section 3-2 N 1 of the Subdivision Ordinance.  The intent is residential.

PL-038-2026
District I - Cm. Gilbert Gonzalez

body

 

PREVIOUS COUNCIL ACTION

N/A

 

BACKGROUND

APPLICANT: TDB Land Holdings, LTD
ENGINEER: Top Site Civil Group, LLC

SITE: This 80.48-acre tract of land is located south of Cielito Lindo Blvd. and west of Cuatro Vientos Blvd. The zoning for this 576-lot development is R-1A (Single Family Reduced Area District) and R-1B (Single-Family High-Density District). This tract is located in District I - Cm. Gilbert Gonzalez.

 

COMMITTEE RECOMMENDATION

N/A

 

STAFF RECOMMENDATION

recommendation

APPROVE SUBJECT TO THE FOLLOWING COMMENTS:

Planning:
1. Staff supports the variance request, provided that traffic calming devices are installed at street segments of 450 to 650 feet with minimum number of speed tables as per Section 3-2 N. 3 of the Subdivision. Should the variance not be granted, revise the street and block layout to comply with Section 3-2 N. 2. and Section 3-2 N. 1. of the Subdivision Ordinance.

2. The proposed master plan does not comply with the Future Thoroughfare Plan in that St. Luke Boulevard is to extend as a collector in a southerly direction followed by a westerly connection towards Ejido Avenue. Revise accordingly.

3. The westernmost entrance of Phase I (Street F) creates a street jog with the westernmost entrance of Phase II (Street A). Revise the layout accordingly.

4. Provide stub out street connections in Phases 4 and 5 to the south and west for future extension and connectivity to adjacent properties, in accordance with Section 3-2 (L) of the Subdivision Ordinance.

5. Identify all adjacent property owners (e.g., New Lake Investments, LTD to the south).

6. The master plan identifies TDB World Industrial Park, LLC as the owner. Update the face of the master plan to reflect the owner/developer as TDB Land Holdings, Ltd as per the application and deed.

7. Identify the proposed use of Block 14, Phase 4.

8. A zone change will be required for the proposed lot dimensions. Please note that preliminary plat approval does not constitute a staff position on zone change requests. Staff’s official position will be provided only upon formal submittal of a zone change application. All zone change requests are subject to City Council discretion and are not guaranteed. Should the zone change request be denied, a plat revision will be required.

9. Access to Cuatro Vientos is subject to the review and approval by Texas Department of Transportation (TX-DOT).

10. All improvements as per the Subdivision Ordinance.


Fire:
1. Fire hydrants required every 500 feet for residential development.


Engineering: No comments submitted.
Environmental: No comments submitted.
Water & Utilities: No comments submitted.
Traffic Safety: No comments submitted.
WEBB County App: No comments submitted.
AEP Engineers: No comments submitted.
U.I.S.D.: No comments submitted.
L.I.S.D.: No comments submitted.
AT&T: No comments submitted.

NOTICE TO THE DEVELOPER:
Planning:
1.
                     Only the utility easements within the plat boundaries are subject to change prior to plat recordation due to revisions by the utility companies.
2.
                     All comments set forth are preliminary comments and not an exhaustive list. Additional comments may be added prior to final plat approval.

end