Legislation Details

File #: 26-P&Z-664    Version: 1
Type: Preliminary Plats and Replats Status: Agenda Ready
File created: 7/29/2026 In control: Planning & Zoning Commission
On agenda: 8/6/2026 Final action:
Title: Preliminary consideration of the plat of Embarcadero Phase 13 Subdivision. The intent is commercial. PL-168-2026 District VII - Cm. Vanessa Perez
Sponsors: Planning & Zoning Commission
Attachments: 1. Aerial Location Map, 2. Plat Notes, 3. Plat Exhibit
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT

title

Preliminary consideration of the plat of Embarcadero Phase 13 Subdivision. The intent is commercial.

PL-168-2026
District VII - Cm. Vanessa Perez

 

body

PREVIOUS COUNCIL ACTION

N/A

 

BACKGROUND

APPLICANT: Farias Development, Ltd.
ENGINEER: Camacho-Hernandez & Assoc.

PROPERTY INFORMATION:
Location: Northwest of Milo Road and Bob Bullock (Loop 20)
Size: Approximately 5.7644 acres, more or less
Proposed Development: 1 lot (Lot 11, Block 8)
Current Zoning: M-1 (Light Manufacturing District)
Council District: District VII - Cm. Vanessa Perez

 

COMMITTEE RECOMMENDATION

N/A

 

STAFF RECOMMENDATION

recommendation

APPROVES SUBJECT TO THE FOLLOWING COMMENTS:
Planning:

1. Revise Plat Note No. 2 to state the following: “All curb cuts shall comply with the Standard Technical Specification Manual, as may be amended from time to time.”

2. Remove the site plan layer from the plat drawing, as site plans are reviewed through a separate approval process and are not part of the recorded plat. 

3. Provide Base Flood Elevations (BFEs) (Section 24.69.7 C (3) - Land Development Code).

4. Coordinate with the Traffic Safety Division and TX-DOT regarding the proposed driveway locations.

5. Identify all easements.

6. All improvements as per the Subdivision Ordinance.

Fire: No comments submitted.
Parks: No comments submitted.
Traffic Safety: No comments submitted.
Engineering: No comments submitted.
Environmental: No comments submitted.
Water & Utilities: No comments submitted.
WEBB County App: No comments submitted.
AEP Engineers: No comments submitted.
U.I.S.D.: No comments submitted.
L.I.S.D.: No comments submitted.
AT&T: No comments submitted.

NOTICE TO THE DEVELOPER:
Planning:

1. Only the utility easements within the plat boundaries are subject to change prior to plat recordation due to revisions by the utility companies.

2.All comments set forth are preliminary comments and not an exhaustive list. Additional comments may be added prior to final plat approval.

end