Consideration to award a construction contract to the lowest, responsible, responsive bidder Andale Construction, Inc., Wichita, Kansas in the amount not to exceed $3,135,848.00 for the FY25-ENG-65 High Density Mineral Bond-Street Maintenance Project for the total base bid including a $150,000.00 contingency allowance and Alternate No. 1. The construction contract time for this project is 120 working days. Funding is available in the Tax Note Fund.
body
1. Andale Construction, Inc., Wichita, Kansas
Total Base Bid Amount including Contingency Allowance and Alternate No. 1: $3,135,848.00
2. AG3 Group, LLC, San Antonio, Texas
Total Base Bid Amount including Contingency Allowance and Alternate No. 1: $4,058,600.00
Refer to attached letter of recommendation.
PREVIOUS COUNCIL ACTION
N/A
BACKGROUND
The purpose of the project is to apply a high-density mineral bond (HDMB) surface treatment to designated roadways in order to extend pavement life, enhance durability, and improve overall roadway performance. The treatment shall provide a uniform, skid-resistant surface that seals the pavement against oxidation, water intrusion, and surface wear.
The project shall include approximately 500,000 square yards of roadway surface treatment within the City of Laredo, as identified by the Engineering Department. A final list of streets and project limits will be provided prior to mobilization.
The contractor shall furnish all labor, materials, equipment, tools, traffic control, and incidentals necessary to complete the application of HDMB seal in accordance with project specifications.
Construction contract time for the project is one-hundred twenty (120) working days.
A total of (2) bids were received at the City Secretary’s office on Thursday, November 6, 2025 at 4:00 P.M. which were publicly opened, read and taken advertisement on Friday, November 7, 2025 at 10:00 A.M.
|
Contractor |
Total Base Bid including Contingency Allowance |
Alternate |
Total Base Bid including Contingency Allowance and Alternate |
|
Andale Construction, Inc., Wichita, Kansas |
$2,045,548.00 |
$1,090,300.00 |
$3,135,848.00 |
|
AG3 Group, LLC, San Antonio, Texas |
$2,386,600.00 |
$1,672,000.00 |
$4,058,600.00 |
VIVA LAREDO PLAN ALIGNMENT
Alignment Rating: Moderate
Supporting goal(s)/policy(ies):
Policy 7.3.3 - “Improve existing and new streetscapes so that traffic speeds are reduced and pedestrians’ and cyclists’ comfort and safety is increased.”
Summary of alignment:
The High Density Mineral Bond project supports the Viva Laredo Comprehensive Plan by contributing to the long-term preservation, safety, and functionality of the City’s roadway network. Although the Plan does not explicitly call for specific pavement preservation treatments, it establishes a clear municipal responsibility for maintaining safe, accessible, multimodal streets and stresses that roadway degradation can undermine community vibrancy and mobility. The HDMB treatment aligns with this intent by extending pavement life, improving surface conditions, and enhancing overall roadway performance in a way that indirectly supports multimodal safety.
COMMITTEE RECOMMENDATION
N/A
STAFF RECOMMENDATION
recommendation
Approval of this motion.
end

Fiscal Impact
Fiscal Year: 2026
Budgeted Y/N?: Y
Source of Funds: Tax Note Fund
Account #: 479-2790-533-2010
Change Order: Exceeds 25% Y/N: N/A
FINANCIAL IMPACT:
Funding is available in the Tax Note Fund.
479-2790-533-2010 with project #SP1832.