File #: 25-P&Z-94    Version: 1
Type: Master Plan Consideration Status: Agenda Ready
File created: 5/5/2025 In control: Planning & Zoning Commission
On agenda: 5/15/2025 Final action:
Title: Review of the revision to the Cielo Vista masterplan. The intent is residential, multi-family, and commercial. The purpose of this masterplan revision is to reconfigure phasing numbers and street realignments. PL-132-2025 District II - Cm. Ricardo "Richie" Rangel Jr.
Sponsors: Planning & Zoning Commission
Attachments: 1. Aerial Location Map, 2. Current Approved Masterplan, 3. Revised Masterplan Submitted
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT

title

Review of the revision to the Cielo Vista masterplan. The intent is residential, multi-family, and commercial. The purpose of this masterplan revision is to reconfigure phasing numbers and street realignments.

PL-132-2025
District II - Cm. Ricardo “Richie” Rangel Jr.

 

body

PREVIOUS COUNCIL ACTION

N/A

 

BACKGROUND

APPLICANT: Cielo Vista, LLC
ENGINEER: Slay Engineering Company, Inc.

SITE: This 291.17-acre tract of land is located northeast of US Highway 83 and La Pita Mangana Road. The zoning for this development is R-1A (Single Family Reduced Area District) and AG (Agricultural). This tract is located in District II - Cm. Ricardo “Richie” Rangel Jr.

 

COMMITTEE RECOMMENDATION

N/A

 

STAFF RECOMMENDATION

recommendation

APPROVE SUBJECT TO THE FOLLOWING COMMENTS:

Planning:
1. In Phase 4, reconfigure Street “W” as it exceeds both the 500-foot threshold and 24 dwelling units for dead-end streets (Section 3-2 L - Subdivision Ordinance).
2. A zone change will be required for the proposed commercial and multi-family.
3. Remove the heavy lines around Vista Del Sur Subdivision (Phase II) as it is not part of this masterplan. 
4. Please be advised that the proposed land use change from single-family to multi-family (in the 9.14-acre lot located south of Street “Z”) constitutes a “substantial alteration” to the current approved masterplan. In accordance with Section 2-3.5 (f) of the Subdivision Ordinance, this type of alteration triggers a new series of permits under Chapter 245 of the Texas Local Government Code.
5. Submit a masterplan revision to the City of Laredo Building Services GIS Division within 10 days of the Planning and Zoning Commission approval in a geo-reference CAD file (Section 2-3.2 (a) 4 - Subdivision Ordinance).
6. Identify all easements.
7. All improvements as per the Subdivision Ordinance.

Fire:
1. Phase 4 - Remoteness - Where two fire apparatus - access roads are required they shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the lot or area to be served measured in a straight line between accesses.
2. Fire Hydrant shall be provided along public and private streets at every 500 feet for residential development.

Engineering: No comments submitted.
Environmental: No comments submitted.
Water & Utilities: No comments submitted.
Traffic Safety: No comments submitted.
Parks & Leisure: No comments submitted.
WEBB County App: No comments submitted.
AEP Engineers: No comments submitted
U.I.S.D.: No comments submitted.
L.I.S.D.: No comments submitted.
AT&T: No comments submitted.

NOTICE TO THEIR DEVELOPER:
Planning:
1. Only the utility easements within the plat boundaries are subject to change prior to plat recordation due to revisions by the utility companies.
2. All comments set forth are preliminary comments and not an exhaustive list. Additional comments may be added prior to final plat approval.