Legislation Details

File #: 25-2106    Version: 1
Type: Consent Agenda Status: Agenda Ready
File created: 10/16/2025 In control: City Council
On agenda: 12/31/2050 Final action:
Title: Consideration to award a construction contract to the sole, responsible, responsive bidder ALC Construction Co., Laredo, Texas, in the amount not to exceed $1,556,324.00 for Re-bid RFP FY24-ENG-69 TIRZ No. 1 Iturbide Street Improvements for the total base bid and additive alternate #4. Construction contract time is 180 working days. Funding is available in the Downtown TIRZ No. 1 Fund. 1. ALC Construction Co., Laredo, Texas Total Base Bid + Additive Alternate #4: $1,556,324.00 Refer to attached letter of recommendation from KCI Technologies, Laredo, Texas.
Attachments: 1. Recommendation From Engineer - RE-BID FY24-ENG-69, 2. BID TABULATION - TIRZ NO 1-ITURBIDE ST. - ALC
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT
title
Consideration to award a construction contract to the sole, responsible, responsive bidder ALC Construction Co., Laredo, Texas, in the amount not to exceed $1,556,324.00 for Re-bid RFP FY24-ENG-69 TIRZ No. 1 Iturbide Street Improvements for the total base bid and additive alternate #4. Construction contract time is 180 working days. Funding is available in the Downtown TIRZ No. 1 Fund.
1. ALC Construction Co., Laredo, Texas
Total Base Bid + Additive Alternate #4: $1,556,324.00
Refer to attached letter of recommendation from KCI Technologies, Laredo, Texas.

body
VIVA LAREDO PLAN ALIGNMENT
Alignment Rating: Strong
Supporting goal(s)/policy(ies):
Policy 3.1.4 "Enhance public infrastructure in the downtown core, including sidewalks, lighting, drainage, and landscaping, to improve comfort, safety, and the overall experience for residents and visitors."
Policy 9.1.2: "Invest in infrastructure improvements that preserve historic character while stimulating reinvestment and tourism."
Summary of alignment:
The Iturbide Street Improvements Project demonstrates strong alignment with the Viva Laredo Comprehensive Plan. The plan explicitly calls for investment in public infrastructure that supports downtown revitalization, pedestrian-oriented design, and preservation of historic character-all of which are addressed by this project.


PREVIOUS COUNCIL ACTION
N/A

BACKGROUND
This project consists of constructing sidewalks, curb and gutter, brick pavers, concrete pavement, asphalt pavement, storm drainage, lighting, electrical, trees and irrigation for five (5) blocks in downtown Laredo along Iturbide Street.
Construction contract time is 180 working days.
A sole bid was received at the City Secretary's office on Thursday, August 7, 2025 at 4:00PM which was publicly opened, read and taken advertisement on Friday, August 8th, 2025 at 10:00AM.

Contractor
Total base bid + Additive Alternate #4
ALC Construction Co., Laredo, Texas
$1,556,324.00

Refer to attach...

Click here for full text