Legislation Details

File #: 25-P&Z-171    Version: 1
Type: Preliminary Plats and Replats Status: Agenda Ready
File created: 7/7/2025 In control: Planning & Zoning Commission
On agenda: 7/17/2025 Final action:
Title: Preliminary consideration of the plat of Embarcadero Southeast Quadrant, Phase 9. The intent is commercial. PL-170-2025 District VII - Cm. Vanessa Perez
Sponsors: Planning & Zoning Commission
Attachments: 1. Aerial Location Map, 2. Plat Notes, 3. Plat Exhibit
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT
title
Preliminary consideration of the plat of Embarcadero Southeast Quadrant, Phase 9. The intent is commercial.

PL-170-2025
District VII - Cm. Vanessa Perez
body

PREVIOUS COUNCIL ACTION
N/A

BACKGROUND
APPLICANT: Farias Development, LTD
ENGINEER: Camacho-Hernandez & Assoc.

SITE: This 4.5337-acre tract of land is located east of FM 1472 (Mines Road) and north of Rancho Viejo Drive. The zoning for this 3-lot development is B-4 (Highway Commercial District). This tract is located in District VII - Cm. Vanessa Perez.

COMMITTEE RECOMMENDATION
N/A

STAFF RECOMMENDATION
recommendation
APPROVE SUBJECT TO THE FOLLOWING COMMENTS:

Planning:
1. Pursuant to Section 2-3. 8 (6) of the Subdivision Ordinance, plats located in areas of special flood hazard where a map revision is proposed must illustrate both existing and proposed floodplain boundaries. Revise the plat drawing accordingly. In addition, include the following plat note: "Existing floodplain lines will be utilized for the purpose of issuing building permits until a Letter of Map Revision (LOMR) is granted by the Federal Emergency Management Agency (FEMA)." Coordinate with the One-Stop Shop (OSS) for floodplain compliance.

2. Pursuant to Section 2-3.1 (a) (iv) of the Subdivision Ordinance, the site plan must be submitted separately. Therefore, please remove the site plan layer from the plat drawing.

3. Pursuant to Section 2-3.2(b)(1)(xii) of the Subdivision Ordinance, the overall boundaries of the plat must be clearly delineated using heavy lines. Revise the plat to ensure the proposed subdivided area is easily distinguishable from surrounding features and adjacent phases, as the current linework does not adequately define the plat boundary.

4. Revise the plat to ensure a logical and sequential numbering of lots within the phase. The current numbering begins with Lot 7, which may cause confusion. Lots should be numbered consecutively and assigned to new block numbers, where there is a clear bre...

Click here for full text