<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Laredo - File #: 2026-R-178</title><link>https://cityoflaredo.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8137653&amp;GUID=5E634EAE-C768-4B58-BB72-B37303582FF2</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://cityoflaredo.legistar.com/Feed.ashx?GUID=5E634EAE-C768-4B58-BB72-B37303582FF2&amp;ID=8137653&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Laredo - File #: 2026-R-178</title><link>https://cityoflaredo.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8137653&amp;GUID=5E634EAE-C768-4B58-BB72-B37303582FF2</link><guid isPermaLink="false">5E634EAE-C768-4B58-BB72-B37303582FF2-2026-07-21-21-36-46</guid><description>Title: A Resolution of the City Council of the City of Laredo, Texas, authorizing the City Manager to ratify the acceptance of Grant No. LRD-SWG-3-48-0136-108-2026, in the amount of $2,102,868 from the Federal Aviation Administration for the design of the extension of Runway 18R extension and the demolition of the Engineering Material Arresting System (EMAS) Project. The performance period will be from July 2026 through July 2030. The City of Laredo will be responsible for providing a local match of $110,677 from the Airport Operating Funds, for a total project cost of $2,213,456. Funding is available in the Laredo International Airport Operating Fund.</description><pubDate>Tue, 21 Jul 2026 21:36:46 GMT</pubDate></item></channel></rss>